推行全过程工程咨询面临的问题与对策 被引量:55

Problems and Countermeasures to Implement the Life Cycle Engineering Consulting
在线阅读 下载PDF
导出
摘要 我国政府鼓励推进的全过程工程咨询服务模式正处于起步探索阶段,相关各方对如何实施开展好全过程工程咨询工作存在诸多问题和疑惑。归纳相关部委和地方政府全过程工程咨询现行政策体系的核心内容和举措;考虑市场、行业和企业的实际情况,分析提出开展全过程工程咨询面临的主要问题和挑战;从需求引导、市场开拓、模式多元、协同合作、体系建设、服务取费、有序竞争等多个方面提出应对策略和措施建议。 The mode of life cycle engineering consulting(LCEC)encouraged by Chinese government is in primary and trial stage.There are various doubts and problems to related parties on how to implement the new mode well.This paper selects the core contents and implementation measures of current policies issued by relevant ministries of the State Council and local governments,and identifies the main problems and challenges in carrying out the LCEC.Accordingly,considering the actual situation of the market,industry and enterprises,this study puts forward the strategies and countermeasures for LCEC from the aspects of demand guidance,market development,diversified modes,collaboration and cooperation,management system improvement,service charging and ordered competition.
作者 赵振宇 高磊 ZHAO Zhenyu;GAO Lei(Institute of Construction Engineering and Management,North China Electric Power University,Beijing 102206,China)
出处 《建筑经济》 北大核心 2019年第12期5-10,共6页 Construction Economy
基金 中国投资协会能源投资专业委员会承担国家能源局电力可靠性管理和工程质量监督中心委托2019年研究课题“工程总承包、全过程工程咨询新型工程建设组织模式下质监管理措施研究”资助
关键词 建设项目 全过程工程咨询 政策分析 对策措施 construction project life cycle engineering consulting policy analysis countermeasure