学校工程施工项目的进度控制与优化策略研究

Research on Progress Control and Optimization Strategy of School Engineering Construction Projects
在线阅读 下载PDF
导出
摘要 研究了学校工程施工项目的进度控制与优化策略,从进度计划编制、进度监控、施工组织管理3个方面出发,分析了优化进度计划、进度动态管理、加强组织管理等关键点,通过技术、组织、经济策略的实施,提高学校工程施工项目进度管理水平。 This paper studies the schedule control and optimization strategies of school engineering construction projects,analyzes the key points of schedule optimization,information monitoring,dynamic early warning,resource cooperative allocation and strengthening safeguard measures from three aspects of schedule planning,schedule monitoring and organization management,and improves the schedule management level of school engineering construction projects through the implementation of technical,organizational and economic strategies.
作者 冯雁波 董艳亮 徐正凯 杨博涵 张相兴 王衡 FENG Yan-bo;DONG Yan-liang;XU Zheng-kai;YANG Bo-han;ZHANG Xiang-xing;WANG Heng(China Construction Second Engineering Bureau First Construction Engineering Co.Ltd.,Shenzhen 518003,China)
出处 《工程建设与设计》 2024年第23期275-277,共3页 Construction & Design for Engineering
关键词 学校工程 施工项目 进度控制 优化管理 school engineering construction projects progress control optimize management
  • 相关文献

参考文献4

二级参考文献15

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部