永泰抽水蓄能电站地下洞室群施工难点及应对措施 被引量:1

Construction Difficulties and Countermeasures of Underground Cavern Group of Yongtai Pumped-storage Power Station
在线阅读 下载PDF
导出
摘要 抽水蓄能电站地下洞室群结构复杂,施工的空间、时间安排及施工方法的合理选用,都会影响到工程安全、质量、进度和职业卫生健康。该文以永泰抽水蓄能电站为例,介绍地下洞室群施工难点,提出相应施工优化改进措施,可供相关工程参考。 The structure of the underground cavern group of pumped storage power station is complicated.The construction space,time arrangement and reasonable selection of construction methods will affect the safety,quality,progress and occupational health of the project.Taking the Yongtai Pumped-storage Power Station as an example,this article introduces the construction difficulties of the underground cavern group,and proposes corresponding construction optimization and improvement measures,which can be used as a reference for related projects.
作者 解迎夏 李博 XIE Yingxia;LI Bo(SINOHYDRO BUREAU 14 CO.,LTD,Kunming 650041,China)
出处 《广东水利水电》 2020年第10期9-12,共4页 Guangdong Water Resources and Hydropower
关键词 抽水蓄能 地下洞室 施工 pumped storage underground cavern construction
  • 相关文献

参考文献4

二级参考文献12

共引文献19

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部