摘要 9104工作面在回采期间揭露陷落柱,开采条件急剧恶化,严重影响矿井的正常安全生产,本文在矿山采用电法勘探、现场钻探的方法对陷落柱的分布范围以及围岩性质进行了探测的基础上提出了相应的治理措施,工程监测结果表明该治理措施对工作面的治理效果较好,涌水量大幅减小。 The collapse column was exposed during the mining period in 9104 working face,which seriously affected the normal safety production of the mine.In this paper,the method of electromagnetic exploration and on-site drilling was used to explore the distribution range of the collapse column and the nature of the surrounding rock,and the corresponding treatment measures were put forward on this basis,which proves that the treatment measures have a good effect on the working face and the water inflow is greatly reduced.
作者 李建 Li Jian(Shanxi Xinyuan Coal Co.,Ltd.,Jinzhong,Shanxi 045400)
出处 《江西煤炭科技》 2020年第3期147-149,共3页 Jiangxi Coal Science & Technology
关键词 陷落柱 电法勘探 现场钻探 围岩稳定性 治理措施 subsided column electrical prospecting field drilling stability of surrounding rock control measures
  • 相关文献

参考文献3

二级参考文献40

共引文献203

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部