期刊文献+

浅述水泥石灰综合处治土施工工艺控制

Brief Introduction to Construction Process Control of Cement Lime Comprehensive Treatment Soil
在线阅读 下载PDF
导出
摘要 在江苏省沿海地区土质主要为粉土和粉质黏土,土性较差,这对修建高速公路路基非常不利,尤其上路床对承载力要求较高。针对这种土质仅采用石灰处治,早期强度较低,为保证施工质量,增强填料的结合性能,对高速公路上路床填料采用4%石灰+2%水泥综合处治土填筑。本文对水泥石灰综合处治土施工工艺控制进行了探讨,以供大家参考。 In the coastal areas of Jiangsu Province,the soil is mainly silt and silty clay,which has poor soil properties,which is very unfavorable for the construction of highway subgrades,and especially the roadbed requires higher bearing capacity.For this kind of soil,only lime treatment is adopted,and the early strength is low.In order to ensure the construction quality and enhance the binding performance of the filler,the roadbed filler on the expressway is treated with 4%lime+2%cement comprehensive soil treatment.This article discusses the construction process control of cement lime comprehensive treatment,for your reference.
作者 肖换芳 XIAO Huan-fang(The Third Engineering Co.,Ltd.of China Railway 12th Bureau Group,Taiyuan 030024,China)
出处 《价值工程》 2020年第7期198-200,共3页 Value Engineering
关键词 水泥石灰综合处治土 施工工艺 cement and lime comprehensive treatment soil construction technology
  • 相关文献

参考文献2

二级参考文献6

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部