摘要
[目的]为实现变电站的建筑标准化设计、工厂化加工和装配式建设。[方法]以500 kV变电站工程站内控制楼为设计研究对象,根据变电站的功能要求,明确其工业性设施的定位。通过综合考虑工艺流程、功能需求、建筑材料、建筑技术、自然条件等因素,对建筑物材料选择、结构选型、模块化设计、防火、节能等方面进行了对比分析。[结果]研究表明:结构、墙体一体化装配式系统在现有的条件下,最适合在500 kV变电站中应用。[结论]结构、墙体一体化装配式系统是具有可行性和代表性的设计方案。
[Introduction]In order to realize the standardized architectural design,factory processing and assembly construction for substations.[Method]The control building of 500 kV substation was taken as the research object,and the location of its industrial facilities was specified according to the functional requirements of the substation.Through comprehensive consideration of process flow,functional requirements,building materials,building technology,natural conditions and other factors,the selection of building materials,structural type selection,modular design,fire prevention,energy saving and other aspects were comparative analysis.[Result]The results show that the structure and wall integrated assembly system under the existing conditions is the most suitable for 500 kV substation.[Conclusion]The structure and wall integrated assembly system is feasible and representative.
作者
张喆
ZHANG Zhe(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China)
出处
《南方能源建设》
2019年第1期109-113,共5页
Southern Energy Construction
基金
中国能建广东院科技项目"500 kV全户内变电站设计研究"(EX03631W)
关键词
装配式
工业性
模块化
assembly type
industrial
modularization