期刊文献+

盾构隧道施工风险数据库系统设计与开发研究 被引量:9

A Risk Events Database System for Shield Tunneling Construction
在线阅读 下载PDF
导出
摘要 盾构已成为隧道施工的主要技术设备之一,为了提高盾构施工技术安全,降低或减少盾构施工风险,针对盾构施工事故及主要风险,本文系统介绍了盾构隧道施工风险事故数据库系统及其功能。该系统主要包括后台风险数据库和前台应用程序,可实现方便地录入盾构施工风险事故信息和记录事故相关的风险因素,并通过多种方式检索各类风险信息,提供盾构施工案例及风险事件的编辑、统计、分析、备份和还原等功能。该盾构隧道施工风险数据库系统可为我国盾构施工风险管理和技能培训提供学习案例和技术参考。 The design and development of a risk events database system and its functions are introduced in detail for improving the safety of shield tunneling and controlling its risk.The system is constituted of an engineering background database and foreground applications.Information of the accidents and relative hazards can be inputted and registered in the database conveniently and can be explored or query in several ways by searching the risk,data,location and shield machines.Risk record modifying,risk reports,data backup and restoring of the database are also available in the system.This system can offer accidents' reports to support the risk management and train engineering workers to master the technology of shield tunneling construction.
出处 《地下空间与工程学报》 CSCD 北大核心 2012年第A02期1656-1659,1664,共5页 Chinese Journal of Underground Space and Engineering
基金 国家自然科学基金项目(41102172)
关键词 盾构隧道 风险管理 风险数据库 shield tunneling risk management risk database
  • 相关文献

参考文献5

  • 1T.M. Williams. Safety regulation changes during pro- jects: the use of system dynamics to quantify the effects of change [ J ]. International Journal of Project Manage- ment, 2000,18 : 23-31.
  • 2Fiona D. Patterson, Kevin Neailey. A risk register data- base system to aid the management of project risk [ J ]. International Journal of Project Management, 2002,20 : 365 -374.
  • 3黄宏伟,曾明,陈亮,胡群芳.基于风险数据库的盾构隧道施工风险管理软件(TRM1.0)开发[J].地下空间与工程学报,2006,2(1):36-41. 被引量:40
  • 4中华人民共和国建设部.地铁及地下工程建设风险管理指南[M].2005.
  • 5中华人民共和国国家标准.城市轨道交通地下工程建设风险管理规范(GB50652-2011)[S].2011.

二级参考文献7

  • 1Soren Degn Eskesen,Per Tengborg,Jorgen Kampmann,Trine Holst Veicherts.Guidelines for tunneling risk management:International tunneling association working group No.2[J].Tunnelling and Underground Space Technology,2004,19:217-237
  • 2@risk.Http://www.palisade.com/html/risk-for-project.asp.
  • 3V.Carr,J.H.M.Tah.A fuzzy approach to construction project risk assessment and analysis:construction project risk management system[J].Advances in Engineering Software,2002,32:P847-857
  • 4Fiona D.Patterson,Kevin Neailey.A Risk Register Database System to aid the management of project risk[J].International journal of project management,2002,20:P365-374
  • 5Chris Chapman.Project risk analysis and management-PRAM the generic process[J].International Journal of Project Management,1997,15(5):273-281
  • 6J.H.M.Tah,V.Carr,R.Howes.Information modelling for case-based construction planning of Highway Bridge projects[J].Advances in Engineering Software,1999,30:495-509
  • 7J.H.M.Tah,V.Carr.Towards a framework for project risk knowledge management in the construction supply chain[J].Advance in Engineering Software,2001,32:835-846

共引文献39

同被引文献69

引证文献9

二级引证文献109

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部