期刊文献+

基于交替迭代遗传算法的多级车间生产计划与调度的集成优化 被引量:8

Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm
在线阅读 下载PDF
导出
摘要 为了提高多级生产系统的运作效率,研究了一类多周期的多级车间生产计划与调度的集成优化问题,该生产系统由一级混批Job-shop车间和一级混流装配车间串联而成.首先建立了该类集成优化问题的混合整数规划模型,该模型从上下游生产车间的需求关系出发,综合考虑上下游车间的物料平衡、设备负荷以及开工位置等约束条件,同时满足优化上下游生产线的费用目标.然后提出了一种交替式混合遗传协调优化算法求解该集成优化问题,其主要思想是给定计划用一种混合遗传算法求调度,反过来给定已求调度用另一种混合遗传算法求取新计划,如此不断交替使用2种混合遗传算法实现计划与调度的同时优化.仿真结果证明了该方法的可行性和有效性. In order to improve the operational efficiency of multi-stage production system,an integrated multi-period multi-workshop production planning and scheduling problem is explored.The production system consists of a mixed-batch Job-shop workshop in series with a mixed-model assembly workshop.An integrated optimization model of the production planning and scheduling is formulated based on nonlinear mixed integer programming.In this model the constraints such as material balance,device capacity,and start position,etc.,are taken into account and the demand relations between the upstream workshop and the downstream workshop are considered synchronously.The cost objectives of the two workshops can be optimized simultaneously.Then an alternant iterative method by hybrid genetic algorithm is employed to solve it,which operates by the following steps: a plan is given to find a schedule by a hybrid genetic algorithm;in turn,a schedule is given to find a new plan using another hybrid genetic algorithm.Two hybrid genetic algorithms are alternately run to optimize the plan and schedule simultaneously.Simulation results show that the proposed method is feasible and effective.
出处 《东南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2012年第1期183-187,共5页 Journal of Southeast University:Natural Science Edition
基金 国家高技术研究发展计划(863计划)资助项目(2007AA04Z112) 国家自然科学基金资助项目(60934008 50875046) 高等学校博士学科点专项科研基金资助项目(20040286012)
关键词 多级车间 生产计划和调度 集成优化 交替迭代方法 混合遗传算法 multi-stage workshop production planning and scheduling integrated optimization alternant iterative method hybrid genetic algorithm
  • 相关文献

参考文献12

  • 1Bowers M R, Jarvis J P. A hierarchical productionplanning and scheduling model[J]. Decision Sciences, 1992, 23( 1 ) : 144 - 159.
  • 2Qiu M M, Fredendall L D, Zhu Z. Application of hier- archical production planning in a multiproduct, multi- machine environment[J]. International Journal of Pro- duction Research, 2001, 39(13) : 2803 -2816.
  • 3Karimi B, Fatemi G. The capacitated lot sizing prob- lem: a review of model algorithms [J].The Interna- tional Journal of Management Science, 2003, 31 ( 5 ) : 365 - 378.
  • 4张晓东,严洪森.一类Job-shop车间生产计划和调度的集成优化[J].控制与决策,2003,18(5):581-584. 被引量:43
  • 5Lasserre J B. An integrated model for job-shop planning and scheduling [J ]. Management Science, 1992, 38 (8): 1201-1211.
  • 6严洪森,夏琦峰,朱旻如,刘霞玲.汽车装配车间生产计划与调度的同时优化方法[J].自动化学报,2002,28(6):911-919. 被引量:27
  • 7周万坤,朱剑英.基于工作流技术的集成化生产计划与调度模型[J].东南大学学报(自然科学版),2003,33(2):197-200. 被引量:6
  • 8Yano A Y, Rachamadugu R. Sequencing to minimize work overload in assembly lines with product options [J]. Management Science, 1991, 37(5) : 572 -586.
  • 9Sarker B R, Pan H. Designing a mixed-model assembly line to minimize the costs of idle and utility times [J ]. Computers & Industrial Engineering, 1998, 34 ( 7 ) : 609 - 628.
  • 10Moghaddam T R, Vahed R. Multi-criteria sequencing problem for a mixed-model assembly line in a JIT pro- duction system[J]. Applied Mathematics and Compu- tation, 2006, 151(10) : 1471 - 1481.

二级参考文献10

  • 1Yan Hongsen. Hierarchical stochastic production planning with delay interaction [J]. J of Optimization Theory and Applications, 2000,104(3):659-689.
  • 2Lasserre J B. An integrated model for job-shop planning and scheduling[J]. Management Science, 1992, 38(8):1201-1211.
  • 3Anwar M F,Nagi R. Integrated lotsizing and scheduling for just-in-time production of complex assemblies with finite set-up[J].Int J of Production Research,1997,35(5):1447-1470.
  • 4Haase K, Kimms A. Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities [J ]. Int J Production Economics, 2000, 66(2): 159-169.
  • 5Kimms A. A genetic algorithm for multi-level, multimachine lot sizing and scheduling [J]. Computers & Operations Research, 1999, 26(8): 829-848.
  • 6Knosala R, Wal T. A production scheduling problem using genetic algorithm[J]. J of Materials Processing Technology, 2001, 109(1-2): 90-95.
  • 7Cheng Runwei, Gen Mitsuo, Tsujimura Yasuhiro. A tutorial survey of job-shop scheduling problems using genetic algorithms--Part II: Hybrid genetic search strategies [J]. Computers & Industrial Engineering,1999. 36(2):343-364.
  • 8Li Y, Ip W H, Wang D W. Genetic algorithm approach to earliness and tardiness production scheduling and planning problem [J]. Int. J Production Economics,1998, 54(1): 65-76.
  • 9严洪森,张晓东.最优递阶随机生产计划与控制[J].自动化学报,2002,28(1):83-89. 被引量:4
  • 10严洪森,张晋格,王炎,黎贞渭.基于EHLEP-N模型的FMS实时调度和控制[J].自动化学报,1992,18(6):679-685. 被引量:2

共引文献72

同被引文献81

引证文献8

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部