5Shao Xinyu,Li Xinyu,Gao Liang,et al.Integration of process planning and scheduling-A modified genetic algorithmbased approach[J].Computers&Operations Research,2009,36(6):2082-2096.
6Shah N K,Ierapetritou M G.Integrated production planning and scheduling optimization of multi-site,multi-product process industry[J].Computers Aided and Chemical Engineering,2011,29:1015-1019.
7Seidgar H,Kiani M,Abedi M,et al.An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem[J].International Journal of Production Research,2013,52(4):1240-1256.
8Azadeh A,Jeihoonian M,Shoja B M,et al.An integrated neural network-simulation algorithm for performance optimization of the bi-criteria two-stage assembly flow-shop scheduling problem with stochastic activities[J].International Journal of Production Research,2012,50(24):7271-7284.
9Na Hongbum,Park J.Multi-level job scheduling in a flexible job shop environment[J].International Journal of Production Research,2014,52(13):3877-3887.
10Zhang Guohui,Gao Liang,Shi Yang.An effective genetic algorithm for the flexible job-shop scheduling problem[J].Expert Systems with Applications,2011,38(4):3563-3573.