期刊文献+

战损装备抢修任务指派模型研究 被引量:4

Study on Task Assignment Model of Wartime Equipment Maintenance
在线阅读 下载PDF
导出
摘要 从现代战争实际情况及装备保障特点出发,将战损装备抢修任务按紧急程度进行分类,建立紧急度不同的抢修任务指派模型,验证了该方法操作简单、切实有效。 Based on the actual circumstance of the modern war and the characteristics of equipment support, the repair assignments of wartime equipment are classified depending on the urgency degree. Models of wartime repair assignment based on the degrees of emergency were based, and this method is proved simply and effectively.
出处 《价值工程》 2010年第35期295-296,共2页 Value Engineering
关键词 指派问题 任务紧急度 装备维修 assignment problem task urgency equipment maintenance
分类号 E9 [军事]
  • 相关文献

参考文献4

二级参考文献22

  • 1白国仲,毛经中.C运输问题[J].数学的实践与认识,2004,34(7):91-96. 被引量:13
  • 2赵景文.广义分配模型及其解法[J].北京市经济管理干部学院学报,2004,19(3):46-53. 被引量:1
  • 3池洁.指派问题中,人员数与工作数不等的情况下的求解方法[J].重庆交通学院学报,1996,15(2):100-105. 被引量:8
  • 4More J J, Wright S J. Optimization software guide[ J ]. Frontiers in Applied Mathematics, 1993,14 (1) :54 -71.
  • 5《运筹学》教材编写组.运筹学[M].北京:清华大学出版社,1990.126-271.
  • 6[美]希利尔 任建标译.数据、模型与决策,运用Excel电子表格建模与案例研究[M].北京:中国财政经济出版社,2001-09..
  • 7余高达 黄成林.战役装备保障学[M].北京:国防大学出版社,2002..
  • 8Strayer J K. Linear Programming and Its Application [M].New York: Springer-Verlag Word Publishing Corp, 1989.
  • 9Gass S I. Linear Programming Methods and Applications(Fifth Edition) [M]. Mc Graw Hill Book Company, 1984.
  • 10Gross O. The Bottleneck Assignment Problem[M]. Santa Monica : The Rand Corporation, 1959:1630.

共引文献36

同被引文献35

  • 1张芳玉,高崎,何鹏,赵广瑞.战时装备维修任务指派模型及算法研究[J].运筹与管理,2006,15(1):62-65. 被引量:22
  • 2田舢,张晓丰,董钰.用遗传算法解决装备抢修任务分配问题[J].航空计算技术,2006,36(1):83-85. 被引量:6
  • 3高守玮,林晨,张卫东.An Enhanced NEH Method in Solving Permutation Flow Shop Problem[J].Journal of Shanghai Jiaotong university(Science),2007,12(1):47-52. 被引量:1
  • 4唐恒永,赵传立.排序引论[M].北京:科学出版社,2005.
  • 5Suliman S. A Two-phase Heuristic Approach to the Permutation Flow-shop Scheduling Problem[ J]. International Journal of Pro- duction Economics, 2000, 64( 1 ) : 143 - 152.
  • 6Andrija V, Borut M, Tome B. Genetic Algorithm Optimization of the Maintenance Scheduling of Generating Units in a Power Sys- tem [ J ]. Reliability Engineering & System Safety, 2008, 93 (6) : 779 -784.
  • 7Nagano M S. A High Quality Solution Constructive Heuristic for Flow Shop Sequencing[ J]. Journal of the Operational Research Society ,2002, 53 ( 12 ) : 1374 - 1379.
  • 8Xing W, Zhang J. Parallel Machine Scheduling with Splitting Jobs[ J]. Discrete Applied Mathematics, 2000, 103:259 - 269.
  • 9曹小平;路广安.装备维修器材保障[M]北京:国防大学出版社,2005.
  • 10WAN K F,ANGUS R,SIMPSON H R. Ant colony optimization for power plant maintenance scheduling optimization a five-station hydropower system[J].Annals of Operations Research,2008,(159):433-437.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部