摘要
介绍大龙潭水电站压力钢管主管及岔管的设计、制造及安装情况。
The description about the design, manufacturing and installating of the trunk pipe and the bifurcated pipes of the steel penstock of Dalongtan Hydropower Station is given.
出处
《湖北水力发电》
2006年第4期33-36,共4页
Hubei Water Power
关键词
压力钢管
月牙肋岔管
设计与施工
penstock, cresent-rib reinforced bifurcated pipe, design and construction