期刊文献+

基于BIM技术的输变电工程施工质量管控模型研究 被引量:11

Research on Construction Quality Management and Control Model of Power Transmission and Distribution Project Based on BIM Technology
在线阅读 下载PDF
导出
摘要 为了解决传统输变电工程施工质量管控模型存在的协同效率低、管控效果差问题,引入BIM技术对输变电工程施工质量管控模型进行构建。为了加强输变电工程施工质量管控的效果,对质量管控组织结构进行搭建,以此为基础,根据施工顺序对质量管控工作流程进行制定,以制定的质量管控工作流程为基础,采用聚类算法对质量管控因素进行提取,并对其进行处理使其参数化,以质量管控数据为依据,以BIM技术为支撑,对输变电工程施工质量管控模型进行构建,并对其进行相应的求解,得到质量管控系数,以此为依据,对质量管控效果进行判定,实现了输变电工程施工质量的管控。通过测试得到,与传统输变电工程施工质量管控模型相比较,构建的输变电工程施工质量管控模型极大的提升了协同效率与管控效果,充分说明构建的输变电工程施工质量管控模型具备更好的质量管控效果。 In order to solve the problems of low collaborative efficiency and poor management and control effect existing in the traditional construction quality control model of power transmission and transformation engineering,BIM technology is introduced to construct the construction quality control model of power transmission and transformation engineering.In order to strengthen the effect of construction quality control in power transmission and transformation projects,the organizational structure of quality control is established.On this basis,the work flow of quality control is formulated according to the construction sequence.On the basis of the work flow of quality control,the clustering algorithm is used to extract the factors of quality control and to deal with them.Based on the quality control data and BIM technology,the construction quality control model of power transmission and transformation project is constructed and solved to obtain the quality control coefficient.On this basis,the effect of quality control is judged,and the construction quality control of power transmission and transformation project is realized.Through testing,compared with the traditional construction quality management and control model of transmission and transformation engineering,the construction quality management and control model of transmission and transformation engineering greatly improves the synergistic efficiency and control effect,fully demonstrating that the construction quality management and control model of transmission and transformation engineering has better quality control effect.
作者 梁杰 姚灏 刘鹏 Liang Jie;Yao Hao;Liu Peng(Guangzhou Yuexiu Power Supply Bureau,Guangzhou 510600,China;Guangzhou Electric Power Design Institute,Guangzhou 510610,China;South China University of Technology,Guangzhou 510600,China)
出处 《科技通报》 2020年第1期114-118,共5页 Bulletin of Science and Technology
关键词 BIM技术 输变电工程 施工质量 管控 信息 BIM technology transmission and transformation engineering construction quality management and control informatio
  • 相关文献

参考文献10

二级参考文献61

共引文献79

同被引文献114

引证文献11

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部