In order to collect rainwater and resist drought to enhance the utilization rate of rainfall and water resources, through project rainwater harvesting measures, the total annual rainwater harvesting amount of the six ...In order to collect rainwater and resist drought to enhance the utilization rate of rainfall and water resources, through project rainwater harvesting measures, the total annual rainwater harvesting amount of the six greenhouses was calculated according to annual average precipitation 542.2 mm, up to 1 095.7 m^3. The upper natural slopes of cultivated land were as rainwater harvesting areas, and total annual rainwater harvesting amount was 49 242 m^3 on the mountain slopes with an area of 73.37 hm^2, while total water storage amount was 39 394 m^3 in theory, so it could meet water use for the irrigation of 26.28 hm^2 of T. sinensis land. To be convenient for rainwater harvesting, irrigation and supplying water to the water-saving cellars, one pert-cut and part-fill reservoir (which was 470 m^3 in volume) was built on the mountain slopes at the right rear of the greenhouses, and their altitude difference was 50 m. The reservoir was sealed and was built with reinforced concrete. Water-saving cellars were distributed in front and the middle and at the back of two rows of greenhouses, and they were connected with each other. The reservoir could supply water to the water-saving cellars and also collect water by mountain slopes, from the lower water-saving cellars or deep wells. Two rainwater hervesting ditches that were 1 650 m in length were at the lower edge of arable land in the upper reaches of slopes to intercept rainfall runoff and make it flow into channels and then the sedimentation tanks. The total annual rainwater harvesting amount of the reservoir and water-saving cellars was 1 222.5 m^3.展开更多
Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined...Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.展开更多
The The Great-West Dyke with a length of 6.7 km, the largest sea wall in China, was completed in June, 1994. This paper introduces structure options of nibble mound sea wall on soft foundation and a new type of armour...The The Great-West Dyke with a length of 6.7 km, the largest sea wall in China, was completed in June, 1994. This paper introduces structure options of nibble mound sea wall on soft foundation and a new type of armour block-hexagon multihole block (HMB) and a new method of treatment for soft foundation by using underwater explosion. Construction practice of some projects in China shows that by using this method good effect of treatment and marked economic benefit can be achieved by using this method.展开更多
The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guarante...The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.展开更多
It is avery important field for educational researcher to use collaborative educational platform to manage and educate students. With the development of the Internet and the popularization of computers, cooperative ed...It is avery important field for educational researcher to use collaborative educational platform to manage and educate students. With the development of the Internet and the popularization of computers, cooperative education is becoming increasingly important. In consideration of the immature stage of the current domestic collaborative education platform, in order to promote the communication among students, teachers and parents, and to facilitate the collaborative supervision and management of teachers and parents, we design and construct the family-school collaborative education platform.展开更多
This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper co...This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.展开更多
The design method of a 6-axis force robot's transducer based on the Stewartplatform is detailed. For this purpose, the sensitivity isotropy evaluation criteria of thetransducer are defined, and by the aid of compu...The design method of a 6-axis force robot's transducer based on the Stewartplatform is detailed. For this purpose, the sensitivity isotropy evaluation criteria of thetransducer are defined, and by the aid of computer, the relationships between the criteria and theparameters of all the transducers based on the Stewart platform are investigated within thegeometric model of the solution space, which can provide the theoretical background for the optimalconstruction design of the 6-axis force transducer related to the sensitivity isotropy.展开更多
In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects refe...In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects referring to the new editions of FIDIC Conditions of Contract in China in 6 aspects: revisions of the existing model contract forms; finding solutions to the payment delay problem; advocating the Design/Build and EPC turnkey project delivery system; clarifying the roles of supervising engineers and opening up the new regions of their work. This paper also prepares a short form model contract for small projects in China, improving the settlement of construction disputes.展开更多
基金Supported by Key Technology R&D Program Project of Shijiazhuang City(141520208A)~~
文摘In order to collect rainwater and resist drought to enhance the utilization rate of rainfall and water resources, through project rainwater harvesting measures, the total annual rainwater harvesting amount of the six greenhouses was calculated according to annual average precipitation 542.2 mm, up to 1 095.7 m^3. The upper natural slopes of cultivated land were as rainwater harvesting areas, and total annual rainwater harvesting amount was 49 242 m^3 on the mountain slopes with an area of 73.37 hm^2, while total water storage amount was 39 394 m^3 in theory, so it could meet water use for the irrigation of 26.28 hm^2 of T. sinensis land. To be convenient for rainwater harvesting, irrigation and supplying water to the water-saving cellars, one pert-cut and part-fill reservoir (which was 470 m^3 in volume) was built on the mountain slopes at the right rear of the greenhouses, and their altitude difference was 50 m. The reservoir was sealed and was built with reinforced concrete. Water-saving cellars were distributed in front and the middle and at the back of two rows of greenhouses, and they were connected with each other. The reservoir could supply water to the water-saving cellars and also collect water by mountain slopes, from the lower water-saving cellars or deep wells. Two rainwater hervesting ditches that were 1 650 m in length were at the lower edge of arable land in the upper reaches of slopes to intercept rainfall runoff and make it flow into channels and then the sedimentation tanks. The total annual rainwater harvesting amount of the reservoir and water-saving cellars was 1 222.5 m^3.
文摘Deformation and failure of high slope impact the construction and operation safety of highway in the mountainous areas. The deformation and failure are mainly caused by poor design which normally has not well combined with the geological conditions and unplanned construction. Therefore, effective design and construction management should be conducted for ensuring a successful construction without damage and risk. In light of the reality of high slope construction along highway in the Huangshan area, this paper proposes a technical procedure for dynamic design and construction management of high slopes along highway in the mountainous area. The proposed construction management scheme is divided into three phases, i.e., 1) design phase, 2) preparation phase of excavation, and 3) construction phase. During the design phase, experiences and lessons learnt from the design and construction of other high slopes along highway in the same region are summarized. The number of slopes and slope height should be optimized from the aspects of route selection and route form. During the preparation phase of excavation, "Excavation Permit Management System" should be adopted, and construction scheme should be made by the construction unit, then the scientific research and design unit determine whether it guarantees slope stability and makes optimization measures. During the construction phase, the scientific research unit would make proposal of optimization design, and apply the achievements of scientific research into practice through common efforts of various units based on the understanding of excavation and investigation. The management system mentioned above is adopted to conduct dynamic design and construction management for more than 90 slopes along the Huangshan - Taling - Taolin Expressway, and successful results of application have been achieved.
文摘The The Great-West Dyke with a length of 6.7 km, the largest sea wall in China, was completed in June, 1994. This paper introduces structure options of nibble mound sea wall on soft foundation and a new type of armour block-hexagon multihole block (HMB) and a new method of treatment for soft foundation by using underwater explosion. Construction practice of some projects in China shows that by using this method good effect of treatment and marked economic benefit can be achieved by using this method.
文摘The high and large span cast-in-place reinforced concrete cantilever structure of the office building of some court, which is located I-steel at the cantilever and used steel pipe scaffold as the support, has guaranteed the frame body and structure security by the frame body calculating, on-site test and reasonable construction order.
文摘It is avery important field for educational researcher to use collaborative educational platform to manage and educate students. With the development of the Internet and the popularization of computers, cooperative education is becoming increasingly important. In consideration of the immature stage of the current domestic collaborative education platform, in order to promote the communication among students, teachers and parents, and to facilitate the collaborative supervision and management of teachers and parents, we design and construct the family-school collaborative education platform.
文摘This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.
基金This project is supported by National 863 plan(No.512-9804-02)Robotics Laboratory,Chinese Academy of Sciences Foundation, China
文摘The design method of a 6-axis force robot's transducer based on the Stewartplatform is detailed. For this purpose, the sensitivity isotropy evaluation criteria of thetransducer are defined, and by the aid of computer, the relationships between the criteria and theparameters of all the transducers based on the Stewart platform are investigated within thegeometric model of the solution space, which can provide the theoretical background for the optimalconstruction design of the 6-axis force transducer related to the sensitivity isotropy.
文摘In this paper, the author gives a brief introduction to the evolution of FIDIC conditions of contract, particularly the background of the 1999 new editions. A detailed discussion is made of the applying prospects referring to the new editions of FIDIC Conditions of Contract in China in 6 aspects: revisions of the existing model contract forms; finding solutions to the payment delay problem; advocating the Design/Build and EPC turnkey project delivery system; clarifying the roles of supervising engineers and opening up the new regions of their work. This paper also prepares a short form model contract for small projects in China, improving the settlement of construction disputes.