摘要
特大桥连线改建工程水土保持措施主要包括工程措施、植物措施和临时措施。工程措施主要包括表土剥离、表土回覆、土地整治等;植物措施主要包括植树、种草等;临时措施包括临时挡水措施、临时覆盖、临时排水沟及临时沉沙池等。文章主要对路基工程区、桥梁工程区、施工生产生活区的水土保持措施布设进行详细论述。
The soil and water conservation measures for the reconstruction project of a long span bridge involve engineering measures,vegetation measures,and temporary measures.The engineering measures mainly include topsoil stripping,topsoil covering,and land consolidation,etc.Plant measures mainly include planting trees and grass.Temporary measures include temporary water retaining measures,temporary covering,temporary drainage ditches,and temporary silting basin.The article mainly discusses the layout of soil and water conservation measures for the subgrade construction area,bridge engineering area,and project construction and living area.
作者
张强
ZHANG Qiang(Tongbai County Reservoir Water Irrigation Area Operation Support Center,Tongbai 474750,China)
出处
《河南水利与南水北调》
2024年第12期10-11,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
水土保持
措施
布设
soil and water conservation
measures
layout