6NG W C, MAK K L. Yard crane scheduling in port container terminal[J]. Applied Mathematical Modelling, 2005,29 ( 3 ) .. 263-276.
7KIM K H, KIM K Y. An optimal routing algorithm for a tr- ansfer crane in port terminals[J]. Transportation Science, 1999,33(1) :17-33.
8REN Wei. Yard crane scheduling with time window and dy namie demand strategy based on resource sharing[J]. Interna tional Journal of Digital Content Technology and Its Applica fions,2012,6 (8) :213-221.
9HU Yanhong, SUN Junqing, HAN Mei, et al. On the optimi- zation of yardcrane scheduling in a eontainer terminal based on GATS[C]//Proceedings of the 29th Chinese Control Confer- ence. Washington, D.C. ,USA:IEEE,2010:5473-5477.
10CAO Zhi, LEE Der-Horng, MENG Qiang. Deployment strate- gies of double-rail-mounted gantry crane syetetrm for loading outbound containers in container terminals [J]. International Journal of Production Economics, 2008,115 (1) : 221-228.