引洮二期庄浪应急供水工程是在引洮二期工程建成但尚未达到设计用水规模的一定时期内,利用工程富余配水指标和富余输水能力,以引洮二期工程为水源,通过供水管线的延伸向庄浪县应急供水,通过与当地水资源联合调度解决全县城乡生活及工业生产用水紧张状况,该供水工程通过实现现代化管理有效促进庄浪县近期社会经济高质量发展。
Yintao Phase II Zhuanglang Emergency Water Supply Project is a project that utilizes the surplus water distribution indicators and transmission capacity of the project during a certain period of time when the project is completed but has not yet reached the designed water use scale.The project uses Yintao PhaseⅡProject as the water source and extends the water supply pipeline to supply emergency water to Zhuanglang County.By jointly scheduling with local water resources,the shortage of water for urban and rural living and industrial production in the county has been resolved.This water supply project effectively promotes the high-quality development of Zhuanglang County's social and economic development in the near future through modern management.
作者
把余英
张永鹏
BA Yuying;ZHANG Yongpeng(Gansu Provincial Water Resources and Hydropower Engineering Bureau Co.,Ltd,Lanzhou 730030,China;Gansu Water Investment Group Co.,Ltd,Lanzhou 734100,China)
出处
《云南水力发电》
2024年第5期28-31,共4页
Yunnan Water Power
关键词
引洮工程
供水
线路比选
管线计算
信息化
Yintao Project
water supply
route comparison
pipeline calculation
informatization