期刊文献+

葛洲坝枢纽二江电站进口拦漂排重建设计 被引量:2

Design of the Reconstruction Scheme for Float Trash Barrier before the Inlets of Erjiang Power Station in Gezhouba Hydropower Project
在线阅读 下载PDF
导出
摘要 根据葛洲坝二江电站水力条件,对拦漂排重建设计,采用固定锚固点结合浮动锚固点的布置方案,优化拦漂排受力体系,选用以“双层塑料浮筒+网衣+重锤+高强聚乙烯主绳”为主排的拦漂排结构,确定主绳、浮筒、网衣及重锤的规格、型号、技术参数等,均满足规范要求。拦漂排重建后运行至今状态良好,其布置方案及结构设计理念可作为同类型工程应用借鉴。 Considering the hydraulic conditions of the Erjiang Power Station in Gezhouba Hydropower Project,the reconstruction scheme of the float trash barrier is designed.A layout scheme with fixed anchorage points combined with floating anchorage points is adopted.The force bearing system of the barrier is optimized.A structure with double-layer plastic buoys,net cover,heavy hammers,and high-strength polyethylene main ropes as the main barrier is selected.Then,the specifications,types and technical parameters of the main ropes,buoys,net cover and heavy hammers are determined to meet the regulatory requirements.After the reconstruction,the float trash barrier has been operating in good condition until now.Its layout scheme and structure design ideas can be useful reference for similar projects.
作者 胡剑杰 钱军祥 HU Jianjie;QIAN Junxiang(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China)
出处 《水电与新能源》 2024年第2期54-57,61,共5页 Hydropower and New Energy
关键词 拦漂排 浮动锚固 塑料浮筒 大跨度 径流式电站 float trash barrier floating anchorage plastic buoy large-span runoff-type hydropower station
  • 相关文献

参考文献5

二级参考文献21

共引文献31

同被引文献15

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部