期刊文献+

某矿露天坑改建排土场后稳定性分析及评价 被引量:5

Stability analysis and evaluation of open pit after the reconstruction of a waste dump
在线阅读 下载PDF
导出
摘要 排土场是露天矿山的重要组成部分,其稳定性问题是露天矿安全生产最为关注的安全问题之一。根据某露天矿实际情况,为减少占地资源,提出将露天坑改设为排土场的方案。通过FLAC^(3D)数值软件进行改建后排土场的稳定性模拟分析,探究改建后的安全性及方案的可行性。研究结果表明,露天坑改建排土场具有较强的可行性,具备突出的社会效应和经济价值;除解决了矿山中排土场的用地问题,节约大量土地,同时为矿山复垦奠定了基础;对比模拟计算结果,考虑自重及地下水条件的安全系数为1.5,考虑自重、地下水及爆破振动影响的安全系数为1.31,均满足三级排土场的稳定性要求。本文为露天坑改建排土场的可操作性提供了可借鉴的技术方案。 Waste dump is an important part of opencast mine,their stability is one of the security issues that people care about.To reduce the occupation,this paper puts forward a plan on how to change the open pit mine into a dump according to the actual situation.The stability simulation of the reconstructed back row soil field by FLAC^(3D) numerical software is to explore the safety and feasibility of the reconstruction.The results show that the project of open pit reconstruction waste dump is feasible,and has an outstanding social effect and economic value.It also solved the land use problem of a waste dump in the mine,saved a lot of land,and laid a foundation for mine reclamation.Compared with the simulation results,considering the dead weight and groundwater conditions is 1.5,and considering the dead weight,groundwater,and blasting vibration effects is 1.31,which meets the stability requirements of the third-level waste dump,it provides a theoretical solution for the operability of the open pit reconstruction waste dump.
作者 刘金龙 LIU Jinlong(Faculty of Resource and Environmental Engineering,Jiangxi University of Science and Technology,Ganzhou Jiangxi 341000,China;Magang Group Design&Research Institute Co.,Ltd.,Ma′anshan Anhui 243000,China)
出处 《有色金属(矿山部分)》 2023年第2期125-130,148,共7页 NONFERROUS METALS(Mining Section)
基金 国家自然科学基金项目(51364012)。
关键词 露天坑 排土场 稳定性分析 安全性 模拟分析 open pit waste dump stability analysis safety simulation and analysis
  • 相关文献

参考文献15

二级参考文献129

共引文献160

同被引文献42

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部