期刊文献+

甘肃玉门抽水蓄能电站输水发电系统布置方案的选择 被引量:2

Selection about Layout Scheme of Water Conveyance System in Yumen Pumped Storage Station
在线阅读 下载PDF
导出
摘要 输水发电系统布置方案是玉门蓄能电站工程前期设计的重大工程技术问题,是枢纽总布置设计的重要内容。该文从地形地质、工程布置及工程投资几个方面对地下厂房和地面厂房方案进行对比,最终选择合适的输水发电系统布置方案。 The layout scheme of water conveyance system is a major engineering technical problem in the preliminary design of Yumen Pumped Storage Station,it is an important part of the general layout design about the hub at the same time.In this paper,the schemes of underground powerhouse and ground powerhouse are compared from the aspects of topography,engineering layout and engineering investment.In this way,choose the proper layout scheme.
作者 王明 宋国栋 WANG Ming;SONG Guodong(Guangdong Hydropower Planning&Design Institute Co.,Ltd.,Guangzhou 510635,China)
出处 《广东水利水电》 2022年第10期79-83,共5页 Guangdong Water Resources and Hydropower
关键词 甘肃玉门 抽水蓄能电站 输水发电系统 地面厂房 Yumen pumped storage station water conveyance system ground powerhouse
  • 相关文献

参考文献10

二级参考文献38

共引文献117

同被引文献5

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部