摘要
介绍了河钢唐钢中厚板1#高炉筛网改造后,入炉原燃料粒度下降条件下的强化冶炼实践。通过加强基础管理,调整高炉基本操作制度,优化高炉操作参数,保持炉缸活跃性,强化炉前出铁管理等一系列措施,实现了高炉稳定顺行、高产低耗的目标。
This paper introduces the intensified smelting practice of No.1 blast furnace with medium and heavy plate at HBIS Group Tangsteel Company after the transformation of the screen mesh.Through a series of measures,such as strengthening basic management,adjusting basic operation system of blast furnace,optimizing operation parameters of blast furnace,keeping activity of hearth,strengthening the management of iron tapping in front of blast furnace,it realizes the goals of stable and smooth operation of blast furnace,high production and low consumption.
作者
曾琦
Zeng Qi(HBIS Group Tangsteel Company,Tangshan 063016,Hebei)
出处
《河北冶金》
2022年第7期35-38,共4页
Hebei Metallurgy
关键词
高炉
原燃料
粒度
烧结矿
焦炭
操作制度
炉缸活跃
blast furnace
raw material and fuel
granularity
sinter
coke
operation system
active hearth