摘要
安全问题始终是隧道工程现场施工予以重点关注的问题。结合以往的施工经验来看,隧道工程施工现场所面临的不确定因素较多,在施工作业期间很容易受到不确定因素的干扰,而相继出现施工安全问题。当施工安全问题表现过于明显且难以控制时,容易相继出现塌方等一系列施工问题。为减少这些问题的出现,本文主要立足于某隧道工程实况,对塌方处理施工方案及相关措施进行研究与分析,以期可以给相关人员提供一定的借鉴价值。
Safety issues have always been a key concern in the on-site construction of tunnel projects.Based on previous construction experience,there are many uncertain factors at the construction site of tunnel project,and it is easy to be interfered by uncertain factors during the construction operation,and accordingly construction safety problems have appeared.When construction safety problems are too obvious to control,a series of construction problems such as collapse are prone to occur successively.In order to reduce the occurrence of these problems,this article is mainly based on the actual situation of the tunnel project,researches and analyzes the collapse disposal and construction plan and related measures,in order to provide certain reference value for the relevant personnel.
作者
申杰
Shen Jie(China Railway Eleventh Bureau Group First Engineering Co.,Ltd.,Xiangyang 441104,Hubei Province,China)
出处
《建筑与装饰》
2021年第29期21-24,共4页
Construction & Decoration
关键词
现场施工
塌方问题
塌方处理
施工方案
site construction
collapse problem
collapse disposal
construction plan