摘要
随着济青高速改扩建工程施工的全线展开,沿线基础设施及通行环境发生了明显改变,通行环境随着工程的进展不断发生改变,严重影响了高速公路的安全通行。山东高速股份有限公司淄博路管分中心从现场施工组织与路网分流相结合,新材料、新技术的应用等方面改进保障措施,在保证工程质量和进度的情况下,有效提高了道路通行能力。本文简单介绍山东高速股份有限公司淄博路管分中心对高速公路改扩建工程畅通保障机制的分析及保障措施的思路和做法。
Along with the Jiqing highway reconstruction and expansion project of the whole line,significant changes have taken place in infrastructure and traffic environment along the route.The traffic environment is changing with the progress of the project,which has seriously affected the safety of the highway.Zibo Road Management Branch Center of Shandong Highway Co.,LTD improved the guarantee measures from the aspects of site construction organization and network diversion combined with the application of new materials and new technologies.Under the condition of ensuring the quality and progress of the project,the road capacity is effectively improved.This article briefly introduces the analysis of the guarantee mechanism of highway reconstruction and expansion project in Zibo Road Branch Center of Shandong Expressway Co.,LTD.with the thinking and practice of the guarantee measures.
出处
《辽宁省交通高等专科学校学报》
2020年第4期39-42,共4页
Journal of Liaoning Provincial College of Communications
关键词
高速公路
改扩建
保障机制
构建
highway
reconstruction and expansion project
guarantee mechanism
construction