期刊文献+

北马其顿高速公路隧道管棚施工技术

Construction Technology of Tunnel Pipe Shed in North Macheng Expressway
在线阅读 下载PDF
导出
摘要 文中分析了在隧道高速公路中使用高强度管棚施工的工艺特点和原理,阐述其施工工艺流程及操作要点,得出此技术成功解决了围岩塌方、山体冒顶、洞身结构裂缝、变形沉降等施工难题,提供了适应在欧洲地区软弱围岩隧道超前支护施工的先例。 This paper analyzes the technical characteristics and principles of high-strength pipe roof construction in tunnel expressway,expounds its construction process and operation points,and concludes that this technology has successfully solved the construction problems of surrounding rock collapse,mountain roof fall,tunnel structure crack,deformation and settlement,and provides a precedent for the advance support construction of tunnel in weak surrounding rock in Europe.
作者 王勇 Wang Yong(ChinaWaterConservancy and Hydropower Engineering Bureau Chengdu Hydropower Construction Co.Ltd.,Chengdu,Sichuan 611130)
出处 《江西建材》 2020年第9期146-147,共2页 Jiangxi Building Materials
关键词 公路隧道 管棚 施工技术 Highway tunnel Pipe shed Construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部