深井高应力巷道围岩大变形机理与控制技术研究

Study on large deformation mechanism and control technology of surrounding rock of high stress roadway in deep shaft
在线阅读 下载PDF
导出
摘要 为解决深井高应力巷道围岩变形严重、支护困难的技术难题,本文采用数值模拟、工业性试验等方法对五阳煤矿7608工作面运输巷围岩变形规律以及支护参数进行了分析与研究。结果表明,随着采动影响的加剧,巷道围岩非连续变形及非对称变形均也逐步加剧,在采用新支护方案后,巷道顶底板及两帮变形量最终稳定在240 mm、320 mm,说明采用锚网索联合支护方案能够有效控制巷道围岩变形破坏。 In order to solve the technical problems of deep shaft high-stress roadway deformation and serious support difficulties, the numerical simulation and industrial tests were used to analyze the deformation law and support parameters of the surrounding roadway in 7608 working face of Wuyang Mine. The results showed that with the intensification of mining, the discontinuous deformation and asymmetric deformation of the surrounding rock of the roadway were also gradually intensified. After adopting the new support scheme, the deformation of roadway roof, floor and two sides finally stabilized at 240 mm and 320 mm, it showed that the combined support scheme of anchor, net and cable can effectively control the deformation and failure of roadway surrounding rock.
作者 张志兵 Zhang Zhibing(Wuyang Mine,Shanxi Lu’an Environmental Energy Development Corporation Ltd.,Changzhi 046200,China)
出处 《煤炭与化工》 CAS 2020年第6期9-12,共4页 Coal and Chemical Industry
关键词 深井 高应力 数值模拟 支护优化 deep shaft high stress numerical simulation support optimization
  • 相关文献

参考文献6

二级参考文献87

共引文献189

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部