摘要
施工现场扬尘防治措施标准由原来的“8个100%”升级为“10个100%”,其中第5个100%是:裸露场地、土堆及物料100%覆盖。工地现场绿网覆盖存在很多的弊端,主要是绿网对环境的极大污染,如何针对不同的问题分类实施不同的措施方案,杜绝二次污染,实施更环保的替代方案等方面本文做了详细的阐述。
The dust control measures for construction sites have been upgraded from the original“8100%”to“10100%”,of which the fifth 100%is:100%coverage of bare sites,mounds and materials.There are many disadvantages of green net coverage at the construction site,mainly due to the huge environmental pollution caused by the green net.How to implement different measures and solutions for different problems,eliminate secondary pollution,and implement more environmentally friendly alternatives elaboration.
作者
范春雷
吴广庆
Fan Chunlei;Wu Guangqing(Taishan District Construction Engineering Quality Technology Center of Tai’an,Tai’an Shandong 271000,China;Taishan District Real Estate Management Center of Tai’an,Tai’an Shandong 271000,China)
出处
《环境与发展》
2020年第6期248-248,253,共2页
Environment & Development
关键词
扬尘防治措施
裸露场地
土堆及物料100%覆盖
绿网
污染
限塑令
Dust control measures
Bare sites
100%Coverage of mounds and materials
Green nets
Pollution
Plastic limit order