期刊文献+

义能煤矿岩巷快速施工设备及配套工艺研究 被引量:3

Study on Fast Construction Equipment and Supporting Technology of Rock Roadway in Yineng Coal Mine
在线阅读 下载PDF
导出
摘要 义能煤矿一直采用风锤打眼爆破、耙装机装岩、矿车排矸的方式进行岩石巷道掘进。岩石巷道掘进机械化水平较低、工人劳动强度比较大、掘进速度缓慢。为了突破岩石巷道快速掘进的瓶颈,配备岩巷凿岩、装岩、排矸机械化作业是岩巷快速掘进的先决条件,优化爆破参数及爆破方案是关键,完善支护参数是基础,科学合理的施工组织是实现快速掘进的前提。 The methods of blasting by wind hammer,rock loading by rake and ore truck are always adopted in Yineng coal mine. The mechanization level of rock tunneling is low,the labor intensity of workers is large,and the tunneling speed is slow. In order to break through the bottleneck of fast tunneling of rock roadway,mechanized operation of rock drilling,rock loading and debris discharging equipped with rock roadway is the prerequisite for fast tunneling of rock roadway,and the key is to optimize blasting parameters and blasting plans,to improve supporting parameters is the foundation,and scientific and reasonable construction organization is the prerequisite for fast tunneling.
作者 张凯生 Zhang Kaisheng(College of Mining and Safety Engineering,Shandong University of Science and Technology,Qingdao 266590,China)
出处 《煤矿机械》 北大核心 2020年第5期98-100,共3页 Coal Mine Machinery
关键词 岩石巷道 快速掘进 配套工艺 rock roadway fast tunneling supporting technology
  • 相关文献

参考文献7

二级参考文献32

共引文献142

同被引文献125

引证文献3

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部