摘要 万家口子水电站挡水大坝是当前世界上最高碾压混凝土双曲拱坝,坝址区位于喀斯特较发育地区,地质条件复杂,大坝设计技术含量高,施工难题突出。电站建设者坚持以问题为导向,以技术为支撑,立足管理创新,技术创新,攻克了诸多重大关键技术难题,创新成果为建设"世界一流大坝"奠定了坚实的基础。 The water retaining dam of Wanjiakouzi Hydropower Station is currently the world’s highest roller compacted concrete double curvature arch dam.The dam site area is located in a relatively developed karst area,with complex geological conditions,high dam design technology content and outstanding construction problems.The power station builders adhere to problem-oriented and technology-supported,based on the management innovation and technological innovation,and have overcome many major key technical problems,thus laying a solid foundation for the construction of a "world-class dam".
作者 高宇 GAO Yu(Datang Xuanwei Hydro Power Development Co.Ltd.,Xuanwei Yunnan 655400)
出处 《红水河》 2020年第1期31-34,共4页 Hongshui River
关键词 双曲拱坝 碾压混凝土 关键技术 科技创新 万家口子水电站 double curvature arch dam roller compacted concrete key technology technological innovation Wanjiakouzi Hydropower Station
  • 相关文献

参考文献10

二级参考文献42

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部