摘要
万家口子水电站挡水大坝是当前世界上最高碾压混凝土双曲拱坝,坝址区位于喀斯特较发育地区,地质条件复杂,大坝设计技术含量高,施工难题突出。电站建设者坚持以问题为导向,以技术为支撑,立足管理创新,技术创新,攻克了诸多重大关键技术难题,创新成果为建设"世界一流大坝"奠定了坚实的基础。
The water retaining dam of Wanjiakouzi Hydropower Station is currently the world’s highest roller compacted concrete double curvature arch dam.The dam site area is located in a relatively developed karst area,with complex geological conditions,high dam design technology content and outstanding construction problems.The power station builders adhere to problem-oriented and technology-supported,based on the management innovation and technological innovation,and have overcome many major key technical problems,thus laying a solid foundation for the construction of a "world-class dam".
作者
高宇
GAO Yu(Datang Xuanwei Hydro Power Development Co.Ltd.,Xuanwei Yunnan 655400)
出处
《红水河》
2020年第1期31-34,共4页
Hongshui River
关键词
双曲拱坝
碾压混凝土
关键技术
科技创新
万家口子水电站
double curvature arch dam
roller compacted concrete
key technology
technological innovation
Wanjiakouzi Hydropower Station