摘要
文章介绍了全过程电网规划管理系统的总体架构,并对电网多维数据协同管理、图模一体化交互、统一化仿真计算及快速潮流调试等几个关键技术进行了分析。在广东电网全过程规划管理系统的开发及应用表明,以上关键技术为系统开发提供了有力支撑,并取得了显著的应用效果。
The overall design of the whole process power system planning management system was introduced.Some key problems such as multi-dimension data collaborative management,chart-module integrate interaction,standardized simulation and fast power flow debugging were analyzed.The development and application of the whole process planning management system in Guangdong Power Grid showed that the above key technologies provided strong support for system development and had achieved significant application effects.
作者
许亮
余浩
XU Liang;YU Hao(Grid Planning&Research Center,Guangdong Power Grid Corporation,Guangdong 510080,China)
出处
《电工技术》
2019年第20期44-46,共3页
Electric Engineering
基金
中国南方电网有限责任公司电力规划专题研究项目(030000QQ00130023)
关键词
电网规划
数据管理
图模交互
统一化仿真
潮流调试
power system planning
data management
standardized simulation
chart-module interactive
power flow debugging