一种风力发电过程评价方法 被引量:1

A METHOD FOR EVALUATING PROCESS OF WIND POWER GENERATION
在线阅读 下载PDF
导出
摘要 对于高比例接入风电电网,消纳风力发电的前提是对风力发电和弃风电量特性进行全面了解,同时需对风力发电和弃风过程进行评估。根据风力发电和弃风电量实际历史数据,提出风力发电应发电量计算方法,构建风力发电和弃风过程的评估指标体系。结合实际算例表明,风力发电和弃风可由该文提出的指标体系描述,不能简单地用天或时段描述,有的过程超过24 h,甚至48 h;不同过程的最大电力和电量也不同,对认知风力发电特性、掌握弃风规律作用明显。 For the high proportion of wind power connected to the grid,the premise of wind power consumption is overall understanding for the characteristics of wind power generation and abandoned wind power. At the same time,the process of wind power generation and abandoned wind should be evaluated. According to the actual historical data of wind power generation and abandoned wind power,this paper proposed the calculation method of wind power should generation and established the evaluation index system for wind power generation and abandoned wind process.Combined with practical examples,wind power generation and abandoned wind can be described by the indicators system proposed in this paper. It cannot be described simply by days or time periods. Some processes are more than 24 hours,or even 48 hours. The maximum power and electricity for different processes are different,which plays a significant role in recognizing the characteristics of wind power generation and mastering the law of abandoned wind.
作者 葛维春 Ge Weichun(State Grid Liaoning Electric Power Co.,Ltd.,Shenyang 110006,China)
出处 《太阳能学报》 EI CAS CSCD 北大核心 2019年第10期2905-2911,共7页 Acta Energiae Solaris Sinica
基金 国家重点研发计划(2017YFB0902100) 国家自然科学基金(U1766204)
关键词 风电 风电消纳 发电 时长 时间序列 wind power wind power consumption electric power generation duration time series
  • 相关文献

参考文献7

二级参考文献84

  • 1汪洋.风电场开发成本分析[J].风能,2010(5):36-41. 被引量:5
  • 2由世俊,朱晏琳,郑雪晶,张欢.供热二级网侧设置燃气调峰锅炉的探讨及节能分析[J].暖通空调,2007,37(1):48-51. 被引量:14
  • 3段玉兵,龚宇雷,谭兴国,等.基于蒙特卡罗模拟的微电网随机潮流计算方法[J].电工技术学报,2011,26(S1):274-278.
  • 4舒印彪,张文亮,周孝信,汤涌,郭强.特高压同步电网安全性评估[J].中国电机工程学报,2007,27(34):1-6. 被引量:140
  • 5Denny E, Maltey O. A quantitative analysis of the netbenefits of grid integrated wind[C].IEEE PowerEngineering Society General Meeting, Montreal,2006: 5-10.
  • 6Xie Kaigui, Billinton R. Determination of theoptimum capacity and type of wind turbinegenerators in a power system considering reliabilityand cost[J]. IEEE Transactions on Energy Conversion,2011, 26(1): 227-235.
  • 7Karlsson K, Meibom P. Optimal investment paths forfuture renewable based energy systems using theoptimisation model Balmorel[J]. International Journalof Hydrogen Energy, 2008, 33(7): 1777-1787.
  • 8Wu Qingbing, Zhou Ming, Sun Liying, et al. Windfarm penetration limit calculation based onevolutionary programming algorithm[C].IEEEInnovative Smart Grid Technologies, Tianjin, 2012:1-5.
  • 9Subcommittee P M. IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979, 98(6): 2047-2054.
  • 10廖萍,李兴源.风电场穿透功率极限计算方法综述[J].电网技术,2008,32(10):50-53. 被引量:44

共引文献1184

同被引文献12

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部