期刊文献+

Optimal Timing and Recycling Operation Mode for Electro-Mechanical Products Active Remanufacturing 被引量:1

Optimal Timing and Recycling Operation Mode for Electro-Mechanical Products Active Remanufacturing
原文传递
导出
摘要 The uncertainties of remanufactured products in multi-life cycle service, such as injury and restoration process route, are comprehensively analyzed in the present study from perspectives of cost and the environment. Based on life cycle assessment method and the life cycle cost analysis, the optimal timing model of active remanufacturing for electro-mechanical products is established considering these uncertainties. In addition, regarding the active remanufacturing as its guidance, this study explores the economic efficiency and corresponding operation mode of electro-mechanical products when recycling in the optimal timing. To validate the optimal timing model for electro-mechanical products active remanufacturing, a specific type of product is taken as a case study with mathematical statistics method and Monte Carlo simulation. The uncertainties of remanufactured products in multi-life cycle service, such as injury and restoration process route, are comprehensively analyzed in the present study from perspectives of cost and the environment. Based on life cycle assessment method and the life cycle cost analysis, the optimal timing model of active remanufacturing for electro-mechanical products is established considering these uncertainties. In addition, regarding the active remanufacturing as its guidance, this study explores the economic efficiency and corresponding operation mode of electro-mechanical products when recycling in the optimal timing. To validate the optimal timing model for electro-mechanical products active remanufacturing, a specific type of product is taken as a case study with mathematical statistics method and Monte Carlo simulation.
出处 《Frontiers of Engineering Management》 2016年第2期115-122,184-185,共10页 工程管理前沿(英文版)
基金 supported by grants from the National Basic Research Program of China (2011CB013406)
关键词 electro-mechanical products active remanufacturing optimal timing reverse logistics recycling mode electro-mechanical products active remanufacturing optimal timing reverse logistics recycling mode
  • 相关文献

参考文献8

二级参考文献62

  • 1徐滨士,刘世参,王海斗.大力发展再制造产业[J].求是,2005(12):46-47. 被引量:42
  • 2张国庆,荆学东,浦耿强,王成焘,徐滨士.产品可再制造性评价方法与模型[J].上海交通大学学报,2005,39(9):1431-1436. 被引量:28
  • 3王丹,徐滨士,董世运.涂层残余应力实用检测技术的研究进展[J].金属热处理,2006,31(5):48-53. 被引量:19
  • 4祁红志,徐惠益.机电产品面向拆卸与回收的设计理论与方法[J].现代制造工程,2007(6):134-138. 被引量:16
  • 5邱定蕃 李东英.关于加快建立资源循环型社会的建议[J].中国工程院院士建议,2002,(48):1-6.
  • 6徐滨士 等.绿色再制造工程及其在我国的应用前景.中国工程院2000年咨询项目[R].,2000.12.
  • 7黄涛.博弈论教程[M].北京:首都经济贸易大学出版社,2004.
  • 8Seliger G, Frank C, Ciupek M. Process and facility planning for mobile phone remanufacturing[J]. Annals of the CIRP,2004, 53 ( 1 ) : 9 - 12.
  • 9Frank C, Yakut E. Process design to the mobiles in the remanufacturing network[ C ]. Proceedings Global Conference on Sustainable Product Development and Life Cycle Engineering, 2004:191 -198.
  • 10Dong Li-hong, Xu Bin-shi, Dong Shi-yun, et al. Monitoring fatigue crack propagation of materials with spontaneous abnormal magnetic signals[ J]. International Journal of Fatigue, 2008, 30 (8) : 1599 - 1605.

共引文献218

同被引文献8

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部