期刊文献+

盖挖逆作地下交通枢纽工程大体积托换梁技术 被引量:1

Research of Large Underpinning Beam Technology From Underground Transportation Hub Project Using Cover and Excavation Top-down Method
在线阅读 下载PDF
导出
摘要 结合天津市地铁文化中心交通枢纽工程实践,论述了桩梁式托换结构对建筑物实施桩基托换的基本施工工艺、方法、应用条件、经验及特点,为以后类似工程的施工提供有益的借鉴,同时也为桩基托换施工提出了一种新思路。 This essay combines the experience of the project of 4 parts of Tianjin metro cultural center traffic hub,and discusses about the construction technology and method,application condition,experience and characteristics of using underpinning technology composed of plies and beams on a structure. It provides an example for the project that are similar in the future,and also provides a new idea for the underpinning construction of pile foundation.
作者 袁黎明 Yuan Li-ming
出处 《建筑技术开发》 2019年第3期50-52,共3页 Building Technology Development
关键词 盖挖逆作法 地铁隧道 桩梁式托换 cover and excavation top-down method subway tunnel underpinning technology composed of plies and beams
  • 相关文献

参考文献4

二级参考文献13

共引文献14

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部