摘要
为实现综放工作面液压支架的快速拆除,对综放工作面的液压支架拆除方法和技巧进行了系统的总结和分析,解决了液压支架拆除中的难题,实现了安全高效拆除液压支架,加快了工作面拆除进度,确保了矿井的衔接接替,创造了巨大的安全和经济效益。
In order to realize the rapid removal of hydraulic support in fully mechanized caving face,this paper systematically summarizes and analyses the removal methods and techniques of hydraulic support in fully mechanized caving face,which solves the difficult problems in the removal of hydraulic support,realizes the safe and efficient removal of hydraulic support,speeds up the removal progress of working face,ensures the succession of mine,and creates enormous safety and economic benefits.
作者
窦瑞军
Dou Ruijun(No.2 Coal Mine of Yangquan Coal Industry Group Co.,Ltd.,Yangquan Shanxi 045008)
出处
《机械管理开发》
2018年第12期181-183,共3页
Mechanical Management and Development
关键词
综放工作面
液压支架
拆除
fully mechanized caving face
hydraulic support
demolition