期刊文献+

阳江市城南新区排涝泵站规模确定 被引量:4

The design runoff of pumping station of Yangjiang South New Area
在线阅读 下载PDF
导出
摘要 根据城南新区河湖密布、蓄涝容积较大的特点,采用调蓄计算法确定泵站排涝规模。在确保城区重要地块不产生有害积水的前提下,充分利用内河调蓄功能,最大限度地缩减了泵站排涝规模,对平原河网地区城市雨水泵站排涝规模的确定具有一定的借鉴意义。 As a plain river network,there are a lot of rivers and lakes in Yangjiang South New Area,and they can storage rainwater when there is rainstorm.Because of this,when we calculate the runoff of the pumping station of Yangjiang South Aera,we can take full advantage of the storage of the rivers and lakes,so we can decrease the design runoff of the storm water pumping station.And it is worth learning for pumping station in plain river network.
作者 郝志鹏 HAO Zhi-peng(Hebei Research Institute of Investigation&Design of Water Conservancy&Hydropower,Tianjin 300250,China)
出处 《水科学与工程技术》 2018年第2期59-61,共3页 Water Sciences and Engineering Technology
关键词 排涝泵站 设计流量 调蓄 storm water pumping station design runoff storage
  • 相关文献

同被引文献38

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部