摘要 某抽水蓄能电站1F机组自2013年5月以来上导摆度和推力瓦温持续偏高,严重影响机组的安全运行。本文对该机组上导摆度过大、推力轴瓦温度偏高的问题进行了深入的分析,排查故障原因;制定了检修方案,对机组固定部件中心、机组轴线、推力内挡油圈同心度及垂直度等进行了处理,同时对推力轴承及冷却油回路进行了详细的检查;检修处理后的运行数据表明机组摆度和推力瓦温基本正常,机组运行状态恢复正常。 Since May 2013, the upper guide swing and the temperature of thrust bearing bush of 1F unit of pumped-storage power station have been too high, so it is dangerous for safe operation of the pumped-storage generating unit. The fault of the over-throw of upper guide swing and the abnormal temperature rise of thrust bearing bush of 1F unit of pumped-storage power station were analyzed in this paper, then the suggestion of the fault is introduced. The fi xed parts center of unit, unit axis, concentricity and verticality of thrust inner oil blocking ring were treated in the unit maintenance, and the thrust bearing and oil cooling loop were inspected detailed. After the unit was repaired, the operation data show that the upper bearing swing and the temperature of thrust bearing bush is normal.
出处 《水电自动化与大坝监测》 2015年第3期16-20,共5页 HYDROPOWER AUTOMATION AND DAM MONITORING
基金 国家电网公司科技项目资助
关键词 混流可逆式机组 推力轴承 摆度大 瓦温偏高 处理 pumped storage generating unit thrust bearing over-throw of upper guide abnormal temperature rise of thrust bearing bush solution
  • 相关文献

参考文献7

二级参考文献5

  • 1哈尔滨大电机研究所编著,水轮机设计手册[M].机械工业出版社.
  • 2哈尔滨电工学院电机教研室著.水轮发电机的振动.大电机技术,.
  • 3平衡块推力轴承的调整计算.大电机技术,.
  • 4水轮发电机的安装,水利电力出版社.
  • 5陈轶华,等.水轮发电机原理及运行[M].北京:中国水利电力出版社2009.

共引文献25

同被引文献16

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部