摘要
针对长距离巷道贯通测量方案设计开展探究,结合具体工程实际,在分析贯通水平误差和高程误差预估的基础上,对如何开展有效测量和相应设备选择做出分析,希望对其他矿井相似工程的开展提供借鉴与参考。
This paper studied the scheme design of breakthrough survey in long distance roadway. Combined with specific engineering practice, this paper analyzed ways to achieve effective measurement and the corresponding equipment selection based on the analysis of the horizontal error and vertical error estimates, which hoped to offer reference for the development of similar engineering of other mines.