冬期施工中电伴热养护的技术研究 被引量:2

RESEARCH ON TECHNOLOGY OF ELECTRIC TRACING METHOD IN CURING CONCRETE IN WINTER CONSTRUCTION
在线阅读 下载PDF
导出
摘要 在冬期施工中,电伴热养护由于其自身优势,应用于实际工程中将会取得一定的工程效益和经济效益。通过建立热平衡方程,求解电伴热所需功率,并研究电伴热不同额定功率和铺设方式对混凝土强度的影响规律。结果表明,混凝土强度随着电伴热额定功率的降低回弹强度先增大后趋于稳定。在额定功率为20W/m时,不仅前期强度增长快,而且具有良好的经济性。相比铺设于上表面,在电伴热铺设于混凝土中部时早期回弹强度较低,但钻芯强度较高,且使强度发展比较均匀,后期强度较高。 In winter construction, the electric heat tracing maintenance due to its own advantages,it will achieve certain engineering benefits and economic benefits when applied to practical projects. By establishing the heat balance equation, the required power of the electric tracing is solved, and the influence of different electric power tracing and the laying method on the strength of the concrete is studied. The results show that the strength of concrete increases firstly and then stabilizes with the decrease of the rated power of the electric tracing. At a rated power of 20 W/m, not only does the early stage strength increase rapidly, but also has good economics. Compared to laying on the upper surface, the early stage spring-back strength is lower when the electric heating trace is laid in the middle of the concrete, however, the drilling core's strength is relative high where the strength development is more uniform and the later strength is higher.
作者 佟琳 申和庆 刘虎 TONG Lin,SHEN Heqing,LIU Hu(BCEG Advanced Construction Materials Co., Ltd., Beijing 100015, Chin)
出处 《低温建筑技术》 2018年第7期150-153,共4页 Low Temperature Architecture Technology
关键词 电伴热 额定功率 铺设方式 早期强度 electric heat tracing rated power laying method early-stage strength
  • 相关文献

参考文献7

二级参考文献30

共引文献46

同被引文献4

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部