期刊文献+

浅谈MTO装置水洗-急冷塔平面布置及管道设计 被引量:1

Discussion on Layout and Pipeline Design of Water Scrubbing Tower in MTO Device
在线阅读 下载PDF
导出
摘要 MTO装置是近年来新发展的生产烯烃方法。MTO装置分为几大部分,水洗-急冷塔属于急冷水洗部分。水洗-急冷塔是保证MTO装置能否正常运转的设备之一。结合MTO装置水洗-急冷塔的配管设计,介绍了塔器管道设计的原则和要求,阐述了MTO装置中水洗-急冷塔管道设计方案和大型支吊架的布置情况。文章还对水洗-急冷塔管道设计中应注意的一些问题进行了探讨。 MTO device is methanol to olefins,which is a new development of production of olefins in recent years.The device is divided into a few parts. Water scrubbing tower belongs to the quick cold water washing part. Water scrubbing tower is one of the equipment to make sure the normal operation of MTO device. Piping design of water scrubbing tower and the arrangement of suspension and support were discussed. Some problems that should be paid attention to in the design of the water washing-quench tower pipeline were also discussed.
作者 郑伟杰 ZHENG Wei-jie(Sinopec Luoyang Petrochemical Engineering Corporation,Luoyang Henan 471003,China)
出处 《广州化工》 CAS 2018年第11期89-90,111,共3页 GuangZhou Chemical Industry
关键词 MTO 水洗-急冷塔 管道设计 支吊架 MTO water scrubbing tower pipeline design suspension and support
  • 相关文献

参考文献5

二级参考文献11

共引文献58

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部