地铁车站明挖区间施工方案比选分析 被引量:2

Comparison of and Analysis on the Construction Scheme of the Cut-and-Cover Tunnel in a Subway Station
在线阅读 下载PDF
导出
摘要 针对北京地铁7号线化工站站后明挖区间现浇混凝土框架结构两种施工方案的比选,从技术可行性、经济分析、材料周转性、施工工期及安全四个方面对衬砌台车施工方案和大模板加脚手架组合的施工方案进行对比分析,经过具体分析得出:采用衬砌台车的施工方案具有施工成本低、施工质量好、施工安全性高、施工速度快的优势,并进行实践应用验证。 Focusing on the comparison of two kinds of cast-in-situ concrete flame structure construction schemes on a cut-and-cover tunnel at Beijing metro line 7 chemical station, this paper compares and analyzes the construction schemes of using lining trolley and the construction plan of large templates plus scaffolding portfolio from four aspects: technical feasibility, economic analysis, materials circulation, construction duration and safety, then puts forward the following conclusion with practical verification: the construction schemes of using lining shutter has advantages of low construction cost, high construction quality, good construction safety.
出处 《石家庄铁路职业技术学院学报》 2016年第3期13-16,共4页 Journal of Shijiazhuang Institute of Railway Technology
关键词 衬砌台车 大模板 经济分析 明挖区间 lining trolley large template economic analysis cut-and-cover tunnel
  • 相关文献

参考文献7

二级参考文献17

共引文献43

同被引文献12

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部