期刊文献+

鳌江四桥关键技术试验研究

Experimental Study on Key Technology of Aojiang River Bridge IV
在线阅读 下载PDF
导出
摘要 鳌江四桥主桥为130 m+150 m的独塔双索面钢混组合梁斜拉桥。通过模型试验研究了组合梁剪力滞效应和索梁锚固构造疲劳性能两个关键技术问题,得出组合梁剪力滞系数,验证了索梁锚固结构在疲劳荷载作用下的安全性,可为桥梁设计提供参考。 The main bridge of Aojiang River Bridge IV is a 130-m + 150-m single-pylon double-plane steel-concrete composite beam cable-stayed bridge. Through the model test, two key technical problems of the shear-lag effect of composite beam and the anchorage structure fatigue performance of cable and beam are studied, the shear-lag coefficient of composite beam is concluded and the safety of cable-girder anchorage structure under fatigue loading is verified, which can be referred for the design of the similar bridges.
出处 《城市道桥与防洪》 2016年第10期59-63,67,共6页 Urban Roads Bridges & Flood Control
关键词 钢混组合梁 剪力滞 疲劳 steel-concretecompositebeam shearlag fatigue
  • 相关文献

参考文献2

  • 1范立础.桥梁工程[M].北京:人民交通出版社,2003..
  • 2BS 5400-5: Steel,concrete and composite bridges[S].PartlO.Code ofpractice for fatigae.London:British Standard Institution, 1979.

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部