摘要 文章以某超大断面交通隧道洞口段超大型塌方冒顶处理为工程背景,以现场试验及监控量测为手段,利用改进的自进式中空锚杆代替小导管,解决了在碎块状—巨块状架空塌碴体中成孔难的问题。通过确定合理的支护参数、注浆量和相应的施工方法,成功地处理了隧道塌方。 Using the treatment of a chimney collapse at the portal section of a tunnel with an extra-large section as an example, and based on a field test as well as monitoring and measuring, this paper successfully solves the problem of drilling holes in an overhead fragmental/massive collapsed body by replacing the condulet with a self-drilling hollow anchor bolt and deals with the collapse based on proper support parameters, grouting volume and relevant construction methods.
出处 《现代隧道技术》 EI CSCD 北大核心 2016年第4期148-153,171,共7页 Modern Tunnelling Technology
关键词 超大断面隧道 塌方冒顶 自进式锚杆 现场试验 监控量测 Tunnel with extra-large section Chimney collapse Self-drilling anchor bolt Field test Monitoringand measuring
  • 相关文献

参考文献4

二级参考文献19

共引文献44

同被引文献124

引证文献16

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部