摘要
以上海市浦东新区浦东大道九号桥临时排水泵站为例 。
Taking the temporary drainage pumping station for No.9 bridge, in Pudong Avenue, Pudong New Area, Shanghai for example, this article expounds the choice of steel sheet pile enclosure in excavation of water collecting well by calculation.
出处
《江西农业大学学报》
CAS
CSCD
2002年第4期559-562,共4页
Acta Agriculturae Universitatis Jiangxiensis
关键词
集水井
开挖
钢板桩围护
计算
excavation of water collecting well, steel sheet pile enclosure