国际工程成本风险分析与对策 被引量:6

Analysis and Countermeasure towards Cost Risk in International Engineering
在线阅读 下载PDF
导出
摘要 针对因国际工程前期准备投入大、中标率低致使我国建筑企业难以承受而面临巨大成本风险的问题,分析导致国际工程价格风险、延期赔偿风险以及成本增加风险等成本风险的原因,提出与当地公司组建联合体投标,在合同签订前进行造价重测、工期重测以及细化合同等应对策略,为我国企业降低国际工程成本风险提供参考。 Considering the problem of tremendous cost risk in international engineering faced by Chinese construction enterprises as a result of large investment in bid preparation and low bidding rate,the paper analyzes the reasons for price risk,delay compensation risk and cost increasing risk in international engineering,provides countermeasures from the prospective of joint bid with local companies,recalculate engineering cost before contract signing,recalculate schedule of project and deepen contract,providing reference for Chinese enterprises to reduce the cost risk of international engineering.
出处 《建筑经济》 2016年第3期16-19,共4页 Construction Economy
关键词 建筑企业 国际工程 成本风险 对策 construction enterprise international engineering cost risk countermeasure
  • 相关文献

参考文献11

二级参考文献11

共引文献40

同被引文献21

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部