期刊文献+

SBS/废胶粉复合改性沥青的性能 被引量:22

Performance of SBS/Crumb Rubber Composite Modified Asphalt
在线阅读 下载PDF
导出
摘要 以AH-70为基质沥青,加入经糠醛抽出油预溶胀的苯乙烯-丁二烯-苯乙烯嵌段共聚物(SBS),外掺胶粉制备复合改性沥青(SBS/CRMA)。通过正交试验考察糠醛抽出油掺量、胶粉掺量、搅拌温度和搅拌时间对改性沥青性能的影响,采用动态剪切流变仪对SBS/CRMA、SBS改性沥青(SBSMA)和胶粉改性沥青(CRMA)的流变性能进行分析,并通过荧光显微镜观察SBS/CRMA的微观结构。由正交试验得到最优方案为:糠醛抽出油掺量8%(质量分数)、胶粉掺量25%(质量分数)、搅拌温度210℃和搅拌时间2.5h。在最优方案下制得SBS/CRMA的5℃延度为327mm、软化点为78.0℃、弹性恢复91.6%。SBS/CRMA在低温下更柔韧,高温下更坚硬,温度敏感性降低,抗车辙形变能力增强。结合荧光显微镜结构图,提出了SBS/CRMA的三维网络结构模型。 Modified asphalt(SBS/CRMA)was prepared using AH-70 as the basic asphalt and adding styrene-butadiene-styrene block copolymer(SBS)pre-swelled by furfural extract oil and crumb rubber.Effects of the amount of furfural extract oil and crumb rubber,stirring temperature and stirring time on the properties of modified asphalt were investigated through orthogonal experiment.Dynamic shear rheometer(DSR)was used to analyze the rheological properties of SBS/crumb rubber composite modified asphalt(SBS/CRMA),SBS modified asphalt(SBSMA)and crumb rubber modified asphalt(CRMA).Fluorescence microscope was used to observe the microstructure of SBS/CRMA.The results showed that SBS/CRMA has 5℃ ductility of 327 mm,softening point of 78.0℃,and elastic recovery of 91.6% under the optimized preparation conditions of furfural extract oil of 8%(mass fraction),crumb rubber amount of 25%(mass fraction),stirring temperature of 210 ℃ and stirring time of 2.5h.SBS/CRMA is more flexible at low temperature and harder at high temperature,and shows better temperature susceptibility and better rutting resistance.Combining the fluorescence microscope graph of SBS/CRMA,a model of three-dimensional network structure was proposed.
出处 《华东理工大学学报(自然科学版)》 CAS CSCD 北大核心 2016年第1期21-27,共7页 Journal of East China University of Science and Technology
关键词 SBS 胶粉 改性沥青 机理 SBS crumb rubber modified asphalt mechanism
  • 相关文献

参考文献19

  • 1凌逸群.沥青生产与应用技术手册[M].北京:中国石化出版社,2010.4.
  • 2程源.废胶粉应用前瞻[J].合成橡胶工业,2001,24(2):65-66. 被引量:33
  • 3DUPUIS D,GODBER J,LESUEUR D,et al.Bituminous binder and method for the production thereof:US8114926[P].2012-2-14.
  • 4WANG Yan,ZHAN Bochuan,CHENG Jian.Study on preparation process of SBS/crumb rubber composite modified asphalt[J].Advanced Materials Research,2012,450(2):417-422.
  • 5CHIPPS J F,DAVISON R R,GLOVER C J.A model for oxidative aging of rubber-modified asphalts and implications to performance analysis[J].Energy & Fuels,2001,15(3):637-647.
  • 6NAVARRO F J,PARTAL P,MARTíNEZ BOZA F J,et al.Influence of processing conditions on the rheological behavior of crumb tire rubber modified bitumen[J].Journal of Applied Polymer Science,2007,104(3):1683-1691.
  • 7NEJAD F M,AGHAJANI P,MODARRES A,et al.Investigating the properties of crumb rubber modified bitumen using classic and SHRP testing methods[J].Construction and Building Materials,2012,26(1):481-489.
  • 8ABDELRAHMAN M A.Engineering characterization of the interaction of asphalt with crumb rubber modifier (CRM)[J].Science and Engineering,1997,57(8):5197-5208.
  • 9孙大权,徐晓亮,吕伟民.橡胶沥青生产工艺关键技术参数的研究[J].长沙交通学院学报,2008,24(3):33-37. 被引量:33
  • 10王志刚,杜英,向丽,程健.废橡胶粉/SBS复合改性沥青制备研究[J].石油炼制与化工,2010,41(4):27-30. 被引量:48

二级参考文献21

共引文献113

同被引文献267

引证文献22

二级引证文献243

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部