摘要
随着我国大型煤矿建设规模的不断扩大,矿井工作面的大型设备稳装工艺和安全对煤炭开采有着重要的意义。该文以某煤矿8207工作面为例,分析了设备稳装的运输线路及顺序,介绍了设备稳装的工艺流程和步骤。
With the continuous expansion of the scale of large coal mine construction in China, the large-scale equipment installation process and safety of mine working face has important significance for the coal mining process. Taking a coal mine 8207 working face as an example, this paper analyzes the transportation line and sequence of the equipment installation, and introduces the process flow and process of the equipment installation.
出处
《山东煤炭科技》
2016年第1期108-109,111,共3页
Shandong Coal Science and Technology
关键词
设备稳装
运输路线
工艺分析
equipment installation transportation route process analysis