富水砂卵石地层暗挖车站洞桩法施工关键技术 被引量:6

Key Construction Technology of the Subsurface Excavation Subway Station by Pile Beam Arch in Water-saturated Sand Gravel Stratum
在线阅读 下载PDF
导出
摘要 基于北京地铁7号线达官营站及其所处特殊的富水砂卵石地层与脆弱的城市环境,围绕该车站洞桩法施工总体筹划、关键技术问题,介绍洞桩法施工的施工组织、工艺流程及采取的技术措施。北京地铁7号线达官营站洞桩法的成功实践表明,洞桩法因建设环境复杂而存在重大施工风险,但利用好现有施工技术、制定有效技术措施完全可规避重大风险,实现安全施工。 Based on water-saturated sand gravel stratum for Daguanying station of Beijing Subway Line No. 7 and fragile urban environment,this paper analyzed the overall planning,key technical problems for the construction of pile beam arch,introduced the construction organization,process,and technical measures applied. Engineering practice showed that pile beam arch because of complex environment has significant risks in construction,but the use of existing construction technology,developing effective technical measures can avoid serious risks to achieve safe construction.
出处 《施工技术》 CAS 北大核心 2015年第23期49-53,共5页 Construction Technology
关键词 地铁 洞桩法 暗挖 施工技术 subways pile beam arch subsurface excavation construction
  • 相关文献

参考文献4

二级参考文献4

  • 1李昊勇,程鹏举,任敬东.北京地铁苏州街站车站暗挖施工技术[J].铁道标准设计,2004,24(11):43-45. 被引量:13
  • 2董惠定.北京地铁车站暗挖施工方法比较及评述.现代隧道技术,2004,.
  • 3北京城建设计研究总院.北京地铁四号线、十号线工程黄庄站施工图文件[G],2003-2005.
  • 4地下铁道工程施工及验收规范(GB50299-1999).北京:中国计划出版社,1999.

共引文献99

同被引文献59

引证文献6

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部