通过对电站2号水轮发电机组转子支架热套轴工艺、松动原因的分析和修复工艺的研究实施,制定合理的修复工艺和方案,对热套轴松动进行了处理,。
Through analysis on the craft of the No. 2 hydroelectric generating set loose rotor bracket thermal sleeve shaft process in the plant and the causes of loose, the research and implementation of the repair, made reasonable repair process and scheme, settled the loose shrunk-in shaft.
出处
《贵州电力技术》
2015年第3期23-26,共4页
Guizhou Electric Power Technology
关键词
转子支架轴孔
主轴
松动
原因分析
修复
rotor bracket axle hole
spindle
loose
cause analysis