急倾斜矿体矿房安全跨度与自稳时间研究 被引量:1

Study on Mine Safe Span and Self-stabilization Time in Steeply Inclined Ore Body
在线阅读 下载PDF
导出
摘要 新疆拜什塔木铜矿矿体破碎,节理裂隙较为发育,由于其自身原因与采矿方法技术参数运用不当,造成矿山生产过程中矿房垮塌,巷道变形严重等问题;为解决此种问题,在现场展开了工程地质调查;通过结构面产状调查与岩体取芯测RQD,结合矿房安全跨度理论得出该矿体的安全跨度约为4m;通过RMR岩体评价得出其值为43,岩体质量为一般,采用目前的采矿方案与技术参数,采空区稳定时间为1~3d ,难以保证矿石回采率与出矿安全性,故应对现有采矿方法进行优化。 The orebody of Baishitamu Copper Mine in Sinkiang is broken, and its joint fissure is developed. Due to its own properies and improper use of technical parameters of mining method, the room collapsed and the roadway deformation was serious during the mine production process. In order to solve this problem, engineering geological survey was launched on the spot. By using structural plane occurrence investigation, calculating RQD, and combining mine safety span theory, safe span of the deposit is about 4 m. Re-sults show that the RMR rock mass evaluation is 43, and rock mass quality is ordinary. Under current mining scheme and technical pa-rameters, the gob stability time is 13 days, which can not ensure the ore recovery rate and mining safety. So the existing mining method is ought to be optimized.
出处 《铜业工程》 CAS 2014年第4期49-53,83,共6页 Copper Engineering
基金 国家自然科学基金重点项目(50934002) 国家自然科学基金项目(51074013) 国家"十二五"科技支撑计划项目(2012BAB08B02)
关键词 节理裂隙 矿房垮塌 工程地质调查 安全跨度 空区稳定时间 joint fissure room collapse engineering geological survey safe span gob stability time
  • 相关文献

参考文献9

二级参考文献71

共引文献256

同被引文献4

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部