公路BOT项目收费价格和特许期的联动调整决策 被引量:14

Adjustment decisions on toll and concession period for highway BOT project
原文传递
导出
摘要 在公路BOT(build-operate-transfer)项目的运营过程中,交通量需求可能偏离预期,动态调整项目收费价格和特许期有助于保证政府、项目公司和社会公众的利益.以达到项目的预期合理收益为目标,根据前n年已实现收益,构建出项目公司在特许期剩余的(T—n)年内预期收益函数.在交通量需求曲线发生右移或左移的情况下,为了避免项目公司获取超额收益或无法实现预期收益,讨论了对项目的收费价格和特许期进行单一调整和联动调整的决策分析方法.最后,结合一个算例进行应用验证,以期为政府和项目公司在公路BOT项目运营过程中调整收费价格和特许期提供参考. When traffic demand deviates from the expectation during the operation phase of highway build-operate-transfer (BOT) project, the dynamic adjustment method on the toll and concession period is helpful to ensure the benefits of the public, the government and the project company. This paperdeveloped an expected profit function of the project company in the remaining (T - n) years based on the actual profit of first n years in order to ensure the project company has a reasonable profit. Furthermore, it discussed the single adjustment and linkage adjustment decisions on the toll and concession period to avoid gaining excess profit or being unable to gain the expected profit for the project company in the case of the traffic demand curve parallel shifts rightward or leftward. Finally, a numeric example was adopted to verify proposed model and provide the reference on toll and concession period adjustment decisions for the government and the project company during operation phase of highway build-operate-transfer (BOT) project.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2014年第8期2045-2053,共9页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71072107 71272091) 辽宁省高等学校优秀人才支持计划(LJQ2013011) 中央高校基本科研业务费(DUT14RW210)
关键词 关键词公路BOT项目 收费价格 特许期 调整决策 build-operate-transfer (BOT) toll concession period adjustment decisions
  • 相关文献

参考文献18

  • 1Akintola A, Matthias B, Cliff H. Public-private partnerships: Managing risks and opportunities[M]. Iowa, USA Blaekwell Publishing Company, 2003.
  • 2Jose G I, John R M. Going private: The international experience with transport privatization[M]. Washington DC: Brookings Institution Press, 1993.
  • 3Engel E, Fischer R, Galetovic A. Privatizing highways in the United States[J]. Review of Industrial Organization 2006, 29(1 2): 27 -53.
  • 4Malini E. Build on operate transfer municipal bridge projects in India[J]. Journal of Management in Engineering 1999, 15(4): 51- 58.
  • 5Xing W, Wu F F. A game-theoretical model of private power production[J]. Electrical Power and Energy Systems 2005, 23:213- 218.
  • 6Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme[J] Transportation Research Part A, 2000, 34(3): 207- 222.
  • 7赵立力,黄庆,谭德庆.基础设施BOT项目的产品价格调整机制研究[J].预测,2006,25(2):74-77. 被引量:24
  • 8Cheng L, Tiong R L K. Minimum feasible tariff model for BOT water supply projects in Malaysia[J]. Construction Management and Economics, 2005, 23(3): 255-263.
  • 9王东波,宋金波,戴大双,李铮.弹性需求下交通BOT项目特许期决策[J].管理工程学报,2011,25(3):116-122. 被引量:33
  • 10Tan Z J, Yang H. Flexible build-operate-transfer contracts for road franchising under demand uncertainty[J]. Transportation Research Part B, 2012, 46(10): 1419-1439.

二级参考文献67

共引文献150

同被引文献124

引证文献14

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部