摘要
针对300 MW机组在调峰运行中对金属部件的影响进行详细论述,提出对引进型300 MW机组应把握的检测重点。同时介绍这些部件的选材。
s: The impacts of cyclic operation of 300 MW generating units on their metallic components are expounded in detail, the main checking and testing points needing attention for import type 300 MW generating units are put forth and the material selections of these components are introduced as well.
出处
《中国电力》
CSCD
北大核心
2001年第4期15-17,61,共4页
Electric Power
关键词
汽轮发电机组
调峰运行
金属部件
检测
: cyclic operation; 300 MW generating unit; metal; checking and testing