摘要
株洲市霞湾污水处理厂是为保护湘江流域而建的工程 ,设计规模为 10万m3/d ,根据污水水质及排放要求 ,处理工艺采用了不设初沉池的氧化沟活性污泥法 ;污泥处理采用了不经消化直接脱水工艺。
Zhuzhou Xiawan Sewage Disposal Plant is an important project to be built for preventing Xiangjiang River from being polluted.The plant will be able to purify 100 000m 3/d in scale.According to the quality of the waste water and the demands of draining water,in the whole disposal technology,the active sewage treatment is used through oxcide ditches without a first-depositing pool and it is driectly dewatered without being digested.The main design parameter and equipment technology parameter are described.
出处
《株洲工学院学报》
2001年第1期60-62,共3页
Journal of Zhuzhou Institute of Technology
关键词
污水处理厂
工艺设计
氧化沟活性污泥法
设计参数
sewage disposal plant
active sewage treatment through technological design oxide ditch
design parameter